ZIPA registration is the step that turns a Zanzibar company into a recognised investment project, with the incentives, land access and work-permit support that come with it. It is also the step where most avoidable mistakes are made.
Most investment capital in Zanzibar now flows into two sectors. By ZIPA's count, the islands have approved more than 1,350 investment projects carrying over USD 14.2 billion in capital. In 2025, real estate and hospitality together took 80.8% of all capital ZIPA approved: TZS 799.3 billion for real estate (42.4%) and TZS 723.1 billion for accommodation and food services (38.4%).
Real estate is the fastest riser. Approved capital in real estate grew from TZS 71.6 billion in 2021 to TZS 799.3 billion in 2025, more than elevenfold, and it overtook hospitality as the largest single sector in 2024.
Zanzibar received a record 917,167 international visitors in 2025, up 24.5% on 2024. Two in three came from Europe, led by Italy, France, Germany and the UK, and the Government is promoting the islands in newer markets such as the Americas and Asia. Your project competes for the same travellers as the Maldives, Mauritius, the Seychelles and the Mediterranean, and as interest grows, sites get harder to secure and applications get closer scrutiny.
You have found the island, the site or the opportunity. Perhaps a boutique hotel on the east coast, a seaweed processing line, or a development near Fumba. What you want now is simple: to start building without wondering whether the paperwork underneath will hold.
Zanzibar runs its own investment authority, its own company registry and its own revenue authority, while some taxes and immigration remain Union matters handled with the Mainland. An application that looks complete can still lock in the wrong structure, the wrong investment figure or the wrong incentive schedule for years.
This guide explains what ZIPA is, who needs it, what it asks of you, what it gives back, and where it sits alongside BPRA, ZRA, TRA and your business licence. It is written for investors who want to understand the risks before they commit capital.
In brief
- ZIPA (the Zanzibar Investment Promotion Authority) registers and certifies investment projects in Zanzibar. It does not replace company registration, tax registration or sector licences.
- Foreign and joint-venture investors who want incentives, leased land for a project, or support with expatriate permits will, in practice, need a ZIPA certificate.
- Minimum capital thresholds are higher than many investors expect: the Zanzibar Investment Act sets USD 2.5 million for foreign-owned hotel and real estate projects and USD 500,000 for other sectors.
- Incentives vary by sector and project size. Tourism, agro-processing, the blue economy, manufacturing and free-zone activities are among the most supported.
- The certificate carries ongoing obligations. Investors who treat it as a one-off approval often lose the very benefits they applied for.
What is ZIPA, and what does the certificate give you?
ZIPA is the Revolutionary Government of Zanzibar's agency for promoting, approving and protecting investment on Unguja and Pemba. It operates under the Zanzibar Investment Act, No. 10 of 2023, and the Zanzibar Investment (General) Regulations, 2025, separate from the Mainland's TISEZA regime, and it also oversees Zanzibar's free economic zones and freeports.
A ZIPA certificate does not create your business. Your company is incorporated with BPRA (the Business and Property Registration Agency). What the certificate does is recognise that company's project as an approved investment. That recognition is what unlocks the practical advantages:
- Incentives. Relief on duties and taxes for capital goods (outside the special economic zones, 75% on imports and 100% on local purchases), and corporate tax exemption for the first five years of operation once conditions are met. Strategic investments can receive more.
- Access to land. Foreigners cannot own land in Zanzibar outright. Approved projects typically hold land on 33-year leases. Renewal, potentially up to 99 years, depends on land law, approval and the terms of the lease.
- People. Work and residence permits for expatriates in key positions approved by ZIPA, processed through its One Stop Centre.
- Protection. 100% foreign ownership is allowed, with statutory guarantees on repatriation of after-tax profits and capital, and protection against expropriation without fair compensation.
- A single point of contact. ZIPA's one-stop centre coordinates with other government bodies, which shortens some steps but does not remove them.
The certificate is issued for a specific project, at a specific investment value, in a specific sector. Every one of those details will be tested again later: by ZRA when you claim relief, by immigration when you apply for permits, and by ZIPA itself when it reviews whether the project was delivered as approved.
The certificate is also not a one-off document. It stays valid for the life of the project, but the investor must renew an Investment Service Licence every year. Each renewal needs a tax clearance, the previous year's business licence and an investment progress report. Any change to the project name, company name, activities, location or capital requires a formal amendment. Transferring shares or assets carries a ZIPA fee of 1.5%, calculated on the greater of the capital transferred, the project's current value or its sale value.
Who needs ZIPA registration?
If you are bringing foreign capital into a Zanzibar project and want the incentives, land and permit support that come with recognised investment, you should plan for ZIPA from the start. Few businesses are legally required to hold a certificate, yet operating without one means giving up incentives, project land leases and permit processing through ZIPA.
Investors who will usually need it
- Foreign individuals or companies setting up a hotel, resort, lodge or other tourism project
- Foreign or joint-venture investors in agro-processing, fisheries, seaweed, manufacturing or energy
- Developers of commercial or residential projects, including those marketed to foreign buyers
- Businesses planning to operate inside a free economic zone or freeport
- Any project that needs leased land, duty-free capital equipment, or expatriate staff in key positions
Investors who may not need it
- Small, locally owned businesses that do not seek incentives
- Service businesses with no land, no significant imported equipment and no expatriate staff
- Branches of foreign firms carrying out short, defined contracts, although these face their own registration and tax questions
Investing from abroad
Many of our clients start the process before they ever land in Zanzibar. That is workable, but it raises the stakes on document preparation. Certified and apostilled documents from your home country, proof of funds that a Zanzibar bank and ZIPA will both accept, and a local representative who is accountable to you, not to the agent who introduced them, all matter more when you cannot attend in person.
If you are still deciding how to structure the company itself, read our guide to company registration in Zanzibar first. The structure you choose there shapes what ZIPA will approve.
What does ZIPA mean for hotel and real estate investors?
Hotel and real estate investors face the highest bar in Zanzibar and the most competition. They are also where ZIPA's incentives and land access matter most.
- Foreign investors in hotels and real estate face a minimum of USD 2.5 million, against USD 500,000 in other sectors. Many boutique hotel, villa and apartment projects sit below that line, and whether to phase, consolidate or proceed without ZIPA has tax, land and permit consequences. That decision should come before land is committed.
- Real estate and hospitality took over 80% of capital ZIPA approved in 2025, and 1,060 accommodation businesses already operate. A feasibility study built on optimistic occupancy will not persuade ZIPA or your bank.
- Leisure travellers make up 99.3% of arrivals and stay about six nights on average. Italy, France, Germany and the UK alone sent over 299,000 visitors in 2025, with South Africa and the United States close behind. A credible business plan is built on figures like these.
- Accommodation took TZS 1.63 trillion of the TZS 3.66 trillion visitors spent in 2025, and 71.9% of the accommodation industry's output comes from tourism. Revenue on that scale draws ZRA and TRA attention to VAT, hotel levy and income tax from the first season.
- Selling units to foreign buyers, appointing a hotel management company or leasing to an operator each needs approvals on top of the ZIPA certificate.
The useful test for a hotel or real estate project is whether it will still hold up, at its planned size and structure, for the full term of the lease.
Should you develop a project or buy into a ZIPA-approved development?
These are two different investor journeys, with different capital requirements and obligations.
- Developing your own project. Your company is the approved investor. It must meet the capital threshold (USD 2.5 million for foreign-owned hotel and real estate projects), hold the certificate, renew the Investment Service Licence every year and carry the reporting, tax and exemption obligations.
- Buying a unit in a ZIPA-approved development. The developer holds the certificate and meets the threshold. In most cases you will not need your own ZIPA certificate to buy. What you receive depends on the development's approval, the underlying lease and your sale agreement, and renting the unit out commercially brings its own registration and tax questions.
Before buying into a development, check that its approval covers sales to foreign buyers, how long the underlying lease runs, who manages the property, and how rental income and a later resale will be taxed. Our articles on whether foreigners can own property and the checks to make before you pay cover this in more detail.
What is the minimum investment for ZIPA registration?
The Zanzibar Investment Act, 2023 sets the minimum capital by who owns the company and, for foreign investors, by sector.
- Hotels and real estate, foreign-owned or joint venture with Tanzanians: USD 2,500,000
- Other sectors, foreign-owned or joint venture: USD 500,000
- Diaspora investors: USD 200,000
- Tanzanian-owned companies: USD 100,000
Strategic Investment status has its own criteria. On Unguja, a project needs USD 50 million with at least 30% contributed as equity, or USD 10 million with at least 500 direct jobs for Tanzanians outside the hotel sector. On Pemba the figures are USD 5 million, or USD 2 million with 100 jobs. Projects on the small islands can also qualify.
For a foreign hotel or property investor, the jump from USD 500,000 to USD 2.5 million shapes how the project is structured and phased. Thresholds can be revised, so the figure for your exact activity should be confirmed with ZIPA before you commit.
Most difficulties come from how the capital is evidenced.
- ZIPA counts the total project investment: equity, shareholder loans, equipment and, in some cases, land development. Each is evidenced differently.
- A project funded mostly by shareholder loans may meet the threshold and still create thin-capitalisation and interest-deductibility issues with TRA later.
- Imported machinery counted towards the threshold must match what is later declared at customs and recorded in your fixed asset register.
- If the project is delivered at a materially lower value, incentives granted on the larger figure can be questioned.
The approved figure also governs your tax position. Corporate tax exemption can only be claimed once at least 75% of the approved capital has been invested and operations have started. We therefore build the investment figure from a costed project plan that your accounts and customs records will still agree with years after approval.
What documents does a ZIPA application require?
The process opens with an online investment intention form, a short concept note for the project. Only once ZIPA accepts it do you buy the application form and lodge the full file. That file rests on five things, and each one carries its own risk.
- A registered company. Incorporated with BPRA, with a shareholding, directors and objects that match the project. A company formed for "general trading" applying for a hotel certificate is a common and avoidable delay.
- A business plan or feasibility study. This is the document ZIPA approves, and it asks for ten copies. It sets out the project, the investment schedule, financing, jobs to be created, and projected returns. Its numbers become the benchmark your project is measured against.
- Evidence of funds and investors. Proof of funds, including bank statements for the last six months, plus passport copies, photographs and CVs. Every director and shareholder also needs a police clearance from their country of origin, and ZIPA's guide also asks for one from the country of residence. These are often the slowest documents to obtain.
- Land or premises arrangements. A lease, an offer of land, or a clear plan for acquiring a site. Land is where foreign investors most often meet surprises in Zanzibar, so this is reviewed with our legal partners before anything is signed.
- Sector and environmental clearances. Depending on the project, an environmental impact assessment with ZEMA, approval from the Zanzibar Commission for Tourism, or clearance from the relevant sector ministry.
Government fees are modest. The application costs USD 200, and the one-time certificate fee is USD 1,000 to USD 1,500 depending on project size, or USD 2,500 for a strategic investment. An Investment Service Licence fee is then payable every year. ZIPA's service times for the certificate steps run to days once the file is complete, so most of the time and cost goes into getting the file complete and right.
Once the certificate is issued, there is also a list of capital goods and project inputs for which relief is sought. That list deserves the same care as the business plan, because every item on it will be checked against what actually arrives at the port.
Why the business plan matters more than investors expect
Most applicants see the business plan as a hurdle to clear. In practice it becomes a reference document for ZIPA, ZRA, TRA, your bank and, in time, any buyer or investor who does due diligence on your company. A plan written quickly to secure approval can later contradict your audited accounts, your tax returns and your customs records. We build these plans as finance documents first, so they remain defensible long after approval.
What incentives does ZIPA offer, and which sectors qualify?
Incentives are the main reason investors register with ZIPA. Each one is granted for an approved project, on approved goods and for a set period, so it does not work as a general tax holiday for the business.
What incentives typically cover
- 100% foreign ownership, with full repatriation of after-tax profits
- Outside the special economic zones, 75% relief on duties and taxes on imported capital goods and 100% on local purchases of construction and capital goods
- Corporate tax exemption for the first five years of operation
- Land leases, typically 33 years, with renewal subject to land law and approval
- Work and residence permits for expatriates in key positions approved by ZIPA
- For strategic investments, up to 100% relief on capital goods and a corporate tax exemption of 100% for five years, then 50% for the next ten
- Allowances on research and development, and accelerated depreciation on plant and machinery
Sectors that receive the strongest support
- Tourism and hospitality. Hotels, resorts, lodges and eco-tourism, especially higher-grade properties and projects outside the most saturated coastal areas.
- Agriculture and agro-processing. Spices, cloves, fruit processing and value addition rather than raw export.
- Blue economy. Fisheries, aquaculture, seaweed farming and processing, and marine services.
- Manufacturing and light industry. Particularly import substitution and export-oriented production.
- Free economic zones and freeports. Logistics, trading and manufacturing in ZIPA's five free economic zones, including Fumba and Micheweni, plus more than 50 islets set aside for investment.
- Real estate and infrastructure. Large commercial and mixed-use developments, including projects that sell units to foreign buyers.
- Energy, oil and gas. Renewable energy and upstream and supporting services.
- ICT, health and education. Projects that bring skills and services the islands currently import.
The catch with incentives
Each incentive comes with conditions. Corporate tax exemption is only available once at least 75% of the approved capital is invested and operations have started. The application must be made within the first two years of operation, with audited accounts filed with BPRA, a progress report, tax clearances, a valid business licence and a valid Investment Service Licence. ZIPA also charges a facilitation fee of 5% of the amount exempted. Import exemptions must be applied for consignment by consignment, at least two weeks before the goods arrive in Zanzibar. Relief granted at the door is also reviewed later. Equipment imported duty-free and then sold, moved to another project or used outside the approved activity can trigger the duty and VAT that were waived, plus penalties. Incentives also need to be reflected properly in your accounts and tax computations, or the benefit is lost in the paperwork.
How does ZIPA fit with BPRA, ZRA, TRA and your business licence?
ZIPA is one authority in a chain, and the chain is where most delays happen. Investors coming from the Mainland are often surprised that Zanzibar has separate bodies for company registration and most taxes, while income tax and immigration are still handled at Union level (how TRA and ZRA split the taxes).
Who does what
- BPRA incorporates the company and holds its official records (how BPRA company registration works).
- ZIPA approves the investment project and issues the certificate that unlocks incentives, land access and permit support.
- ZRA (Zanzibar Revenue Authority) administers VAT at 15%, hotel levy, stamp duty and other Zanzibar taxes, and applies VAT relief granted under the certificate.
- TRA (Tanzania Revenue Authority) administers income tax, PAYE, withholding tax and customs, including in Zanzibar. Your company needs a TIN from TRA as well as registration with ZRA.
- Sector licensing bodies issue the licence to operate: the Zanzibar Commission for Tourism for hotels and tour operations, and the relevant ministry or municipal council for other activities.
- Labour and ZSSF handle social security and employment compliance. For ZIPA-registered investors, work and residence permits run only through ZIPA's One Stop Centre, not directly with the Labour Department or Immigration.
The usual order
Stage | What happens | Who |
|---|---|---|
1. Planning and structuring | Ownership, investment figure, funding and exit route agreed | Investor and advisers |
2. Incorporation | Company registered | BPRA |
3. ZIPA application | Intention form, business plan, full application, certificate | ZIPA |
4. Land and clearances | Lease, environmental assessment, sector approvals | ZIPA, ZEMA, sector bodies |
5. Tax, bank and licences | TIN, VAT registration, bank account, business licence | TRA, ZRA, licensing bodies |
6. Implementation | Equipment imported under exemptions, construction, permits, hiring | ZIPA, customs, Labour, ZSSF |
7. Ongoing compliance | Annual Investment Service Licence, progress reports, audited accounts, tax filings | ZIPA, ZRA, TRA |
The steps overlap, and the order shifts by sector. What does not shift is that each body relies on documents issued by the others. A name, address or share figure that differs by one line between BPRA, ZIPA and TRA records can hold up a licence or an import clearance for weeks.
Where do investors get caught out?
Most ZIPA problems do not appear at approval. They appear one to three years later, when the project is running and the original paperwork is tested against reality. These are the patterns we see most often.
"The certificate means we are compliant." It does not. It is one approval among many, and it comes with an Investment Service Licence that must be renewed every year, with a progress report each time. Tax registrations, sector licences, permits and annual filings still have to be kept current, and each has its own penalties.
A business plan written to pass, not to last. Inflated job numbers, optimistic revenues or a capital figure stretched to meet the threshold become benchmarks you are later measured against.
Nominee and agent risk. Investors who let an agent or local contact hold shares, directorships or bank mandates "temporarily" can find that control is hard to recover. Your interests should always sit in your own name and under your own signature.
Land signed before structure. A lease signed personally, or by the wrong entity, can leave the investment outside the company that holds the certificate, with tax and inheritance consequences.
Treating Zanzibar like the Mainland. Different registry, different VAT rate, different revenue authority, and a split between Zanzibar and Union taxes. Advice that is correct in Dar es Salaam can be wrong in Stone Town.
Losing the incentive in the books. Duty-free equipment that is not tracked in a fixed asset register, or VAT relief that is not reflected properly in returns, invites reassessment.
No plan for exit. How shares are held, how capital came in, and how profits are repatriated all affect what you can recover when you sell, restructure or bring in a partner.
A hotel management contract signed without approval. Under the 2025 Regulations, a management company for an approved investment needs ZIPA's approval before taking over. A contract signed without it is ineffective, and entering into it is an offence carrying a fine of at least USD 10,000. Owners who appoint an operator first and seek approval later put both the contract and the certificate at risk.
Each of these can be prevented when the accounts, tax and legal structure are planned together from the start.
How Glenrich helps
Glenrich Consultants is a finance and risk partner for investors and growing businesses in Zanzibar and mainland Tanzania. Our team brings together accountants, auditors, tax consultants, forensic examiners, and investment and legal advisors. We handle the compliance, and we look for the risks underneath it.
On a ZIPA project, our work is to make the parts agree with each other: the investment structure, the approved capital, the projections in the business plan, the tax treatment of incentives, and the reporting ZIPA, ZRA and TRA expect each year. When those line up from the start, approvals, exemptions and an eventual sale are far easier to defend.
For ZIPA matters, we work alongside established law firms on the legal side, including land leases, shareholder agreements and regulatory opinions, so your legal and financial advice come from one coordinated team.
How we work with you
- Review and structure. We review your project, your funding and your plans for ownership and exit. We then recommend the company structure, investment figure and incentive approach that will hold up with ZIPA, ZRA, TRA and your bank.
- Prepare and secure approval. We prepare the business plan and financial projections, assemble and check every supporting document, and manage the ZIPA application together with BPRA, tax registration and licensing. You receive clear updates at each stage, wherever you are in the world.
- Protect what you have built. After approval, we keep the project compliant: books, tax filings, incentive tracking, payroll and permits, and the annual reporting that keeps your certificate and your benefits secure.
Investors who come to us early spend less time chasing approvals and more time building. Those who come later usually come because something has already gone wrong: a stalled import, a reassessment, or a partner dispute that the original paperwork did not anticipate.
If you are planning an investment in Zanzibar, or are part-way through ZIPA and unsure whether your application will hold, talk to us before your next step.
Book a free introductory call and receive a fixed-price proposal within 24 hours.
Frequently asked questions
What is ZIPA registration? ZIPA registration is the approval of an investment project by the Zanzibar Investment Promotion Authority. It results in a certificate that gives the project access to incentives, leased land and support with expatriate permits.
Is ZIPA registration mandatory for foreign investors in Zanzibar? Not for every business. But foreign investors who want incentives, leased land or expatriate permits for a project will, in practice, need a ZIPA certificate.
What is the minimum investment for ZIPA? The Zanzibar Investment Act, 2023 sets USD 2.5 million for foreign investors in hotels and real estate and USD 500,000 in other sectors. Diaspora investors need USD 200,000 and Tanzanian-owned companies USD 100,000. Confirm the figure for your exact activity before applying.
Is ZIPA the same as BPRA? No. BPRA registers your company. ZIPA approves your investment project. You need BPRA registration before applying to ZIPA. Our guide to registering a company in Zanzibar covers that step.
Do I register for tax with ZRA or TRA in Zanzibar? Usually both. ZRA handles VAT and other Zanzibar taxes. TRA handles income tax, PAYE, withholding tax and customs, including for businesses in Zanzibar.
Can a foreigner own land in Zanzibar? Not outright. Foreign investors generally hold land through leases linked to an approved project, typically 33 years, with renewal subject to approval and the lease terms, or buy units in designated developments. Structure and lease terms should be reviewed before signing. Our guide to land and property ownership in Zanzibar explains the routes.
How long does ZIPA registration take? ZIPA's published service times put the certificate steps at roughly 4 to 10 working days once a complete file is lodged. Preparing that file, and the wider journey through company registration, land, clearances and licences, usually takes several months.
Can I apply for ZIPA from outside Tanzania? Yes. Many investors begin from abroad. Documents must be properly certified, police clearances are needed from your country of origin (and, under ZIPA's guide, your country of residence), and you need a representative in Zanzibar who acts in your interest.
Which sectors get ZIPA incentives? Tourism and hospitality, agro-processing, the blue economy, manufacturing, free-zone activities, real estate, energy, ICT, health and education are among the most supported.
Sources
Zanzibar Investment (General) Regulations, 2025, Investment Service Licence, fees (Fourth Schedule), police clearance and corporate tax exemption conditions
Zanzibar Investment Act, No. 10 of 2023: capital thresholds (Second Schedule), strategic investment criteria and incentives (Third and Fourth Schedules)
ZIPA investment guide: documents, import exemption procedure and land leases
eRegulations Zanzibar: Obtain Certificate of Investment: steps, fees and service times
ZIPA frequently asked questions: permits, monitoring, free economic zones
Office of the Chief Government Statistician, Zanzibar Tourism Satellite Account 2025 (November 2026): visitor arrivals, spending, employment, accommodation businesses, and capital approved by sector (Table 6.3, from ZIPA's administrative database)
Figures reflect ZIPA's published sources as of November 2026. Thresholds and fees can change, so confirm them with ZIPA before committing capital.